What keeps Ashford extension projects organised.
Options reviewed early
Rear and two-storey routes can be compared before plans are taken too far.
Technical follow-through
Building Regulations drawings can develop from the approved design in sequence.
Useful first information
Addresses, sketches and photos help us guide the project from the first call.

Extension planning that keeps the technical stage in view.
Extra space projects in Ashford often start with a choice. Do you extend to the rear, build over two floors, or focus first on the technical information needed to make a design buildable? We help you test that choice against the property itself. Through CB Planning Agent, the process begins with a project discussion and site survey, then moves into the planning or technical drawings that suit the proposal. For Ashford homeowners, that can mean comparing a larger ground-floor layout with the wider gains of a two-storey scheme, while also keeping an eye on the Building Regulations work that may follow.
One route from design ideas to compliant detail.
Once the direction is settled, we can prepare the relevant planning drawings, advise on approval requirements and develop the more detailed package needed for Building Control when the job reaches that stage. Choosing CB Planning Agent helps because the design and compliance sides of the project do not become separate conversations. In Ashford, you can send us the property address, any sketches or photos and a brief outline of the work, and we can help you map out the clearest next step.

Frequently asked questions
Can you help me choose between a rear and two-storey extension?
Yes. We can compare how much space each approach is likely to create, how it will change the house and what planning or technical issues are likely to follow. That early review is often the easiest way to decide whether the project should spread out across the plot or build on top of the existing layout.
What should I send before an Ashford consultation?
The most useful starting details are the property address, the type of project you are considering, any sketches or photos you already have and your current planning position if anything has been discussed before. That gives us enough context to guide the first conversation properly.
Can you take an approved design on to Building Regulations?
Yes. Once the planning stage is resolved, we can prepare the more detailed technical drawings needed for Building Regulations. Keeping that work connected helps because the extension design and the compliance details should develop from the same scheme rather than split apart.
